Food OEM Quote Request Checklist
Six mandatory inputs, cost drivers, regulatory items and an OEM/ODM/OBM MOQ & lead-time table on a single page.
- Six mandatory quote inputs
- OEM/ODM/OBM MOQ & lead time
- Five things to check in a quote
Food OEM unit cost breaks down into six lines: (1) ingredients, (2) processing (line, labor, depreciation), (3) packaging, (4) licensing & claims, (5) logistics/warehousing, (6) margin. Seobifood delivers itemized quotes from its consortium so brands can pinpoint cost drivers and set SKU-level pricing.
RTD 음료는 원료·용기 비중이 크고 라인 시간당 캐파가 원가에 큰 영향을 미칩니다. 프로틴 바는 개별 포장 필름·이형지 비중이 20% 이상입니다. 젤리스틱은 원료+파우치 인쇄비 비중이 큽니다.
Figures were reviewed by Seobifood on 2026-08-08 and vary by dosage form, volume and filing requirements. Cite as "Seobi Co., Ltd., Food OEM quote request checklist (2026-08-08)". Request a quote
Submit an inquiry and a specialist PM replies within 1-3 business days with the checklist items relevant to your project.
Six mandatory inputs, cost drivers, regulatory items and an OEM/ODM/OBM MOQ & lead-time table on a single page.
From quote request to spec lock, factory matching, pilot run, label review, mass production and QC release — with lead times and deliverables.
HACCP vs GMP, and which cert each export market requires.
Read more →RTD, bar, stick, powder, jelly — pros/cons and best fit for new brands.
Read more →Standard powder sticks/tablets: 1,000 units. Bar, RTD and pilot quantities are confirmed after reviewing specifications.
Read more →